Fearnley Procter Group - Reducing Non-productive-time

- forumfearnleyprocter.co.uk

Fearnley Procter Group specialise in the reduction of non-productive time during the drilling and completion phases of oil and gas developments. We provide quality assurance and quality control (QA/QC) inspection services for oil and gas operators around the world. Our experienced Engineering team provides internationa

Not Applicable $ 8.95


Drillingsoftware, Drilling software & free downloads

- drillingsoftware.info

Drilling and Workover software, Casing Design, Preventative Maintenance Scheduling and Drilling Rig Maintenance, Workover, Completions Reporting, Well Control,

Not Applicable $ 8.95


Drilling Operation

- drillingmanual.com

This is an educational drilling blog. Its main topics about oil/gas drilling wells operations, design to be a guide for the drilling people.

9,164,535 $ 240.00